$86 Billion of Services Backlog, 9% Beyond 2040Wide moat

GE Vernova (GEV) — moat facet

GE Vernova has $86 billion of contracted services backlog, and nearly a tenth of it runs beyond fifteen years.

GE Vernova's services backlog is the plainest evidence of the lock-in. Services remaining performance obligations were $85,993 million at the end of 20251, 57.2% of the $150,238 million total2. Of that services backlog, 17% is expected within one year, 52% within five, 77% within ten and 91% within fifteen3. About 9% runs beyond fifteen years4.

Services RPO expected to convert, cumulative (%)17%Within 1 year52%Within 5 years77%Within 10 years91%Within 15 yearsGE Vernova Form 10-K FY2025, remaining performance obligations note
Almost half of the services backlog lands after 2030.

The figure counts only what cannot be walked away from. RPO is measured "excluding any purchase order that provides the customer with the ability to cancel or terminate without incurring a substantive penalty"5. These are contracted obligations, not hopes.

Services backlog grew more slowly than equipment backlog in 2025: 13.2% against 49.2%6. That is what a turbine boom looks like: the equipment orders arrive first, and the service contracts follow the machines into operation. By June 2026 services RPO was $88,463 million7.

The services backlog is about five times the company's 2025 services revenue8, which is a long runway for a business whose customers are utilities and grid operators.

The June 2026 figures show the conversion profile holding. Of services RPO then, 16% was expected within one year, 54% within five, 79% within ten and 92% within fifteen9. The long tail shortened slightly as the older contracts moved closer to delivery, but the shape, a decade and more of contracted work, did not change.

The backlog's growth rate is the thing to watch. Services RPO grew 13.2% in 2025; if it stalls while equipment RPO keeps rising, the boom will be selling machines to owners who choose not to sign GE Vernova's service contracts.

Moat trajectory: Widening

Services RPO $85,993M (2025) to $88,463M (June 2026).

The number that tests this moat
Reported
Services remaining performance obligations, latest quarter
$88,463M (30 June 2026)

Contracted service revenue; a stall while equipment backlog rises would mean new turbines are not being signed to service.

Source: GE Vernova Form 10-Q, Q2 2026 ↗
⚠ Threats to the moat
References
  1. ReportedServices remaining performance obligations were $85,993 million at the end of 2025, 57.2% of the $150,238 million total.
    GE Vernova Form 10-K for fiscal 2025 - remaining performance obligations note. — FY2025 · publ. 29 January 2026 · source ↗
  2. Moat Explorer calcServices remaining performance obligations were $85,993 million at the end of 2025, 57.2% of the $150,238 million total.
    Moat Explorer calculation from GE Vernova's Forms 10-K and 10-Q, the Form 10 information statement, results releases and market data ($ millions unless stated). Equipment gross profit = sales of equipment less cost of equipment: 18,831 - 18,654 = 177 (2021, 0.9%); 15,819 - 16,972 = -1,153 (2022, -7.3%); 18,258 - 18,705 = -447 (2023, -2.4%); 18,952 - 17,989 = 963 (2024, 5.1%); 20,934 - 18,759 = 2,175 (2025, 10.4%). Services gross profit: 14,175 - 9,407 = 4,768 (2021, 33.6%); 13,835 - 9,224 = 4,611 (2022, 33.3%); 14,981 - 9,716 = 5,265 (2023, 35.1%); 15,983 - 10,861 = 5,122 (2024, 32.0%); 17,134 - 11,774 = 5,360 (2025, 31.3%). Services share of gross profit 5,360 / 7,535 = 71.1% (2025); 5,122 / 6,085 = 84.2% (2024); 5,265 / 4,818 = 109% (2023). Services share of revenue 17,134 / 38,068 = 45.0%. Power services share of Power revenue 13,081 / 19,767 = 66.2%. Gas Power share of revenue 16,006 / 38,068 = 42.0%. Gas turbines under long-term service agreements 1,800 / 7,000 = 26%; onshore wind turbines under service agreements 24,000 / 59,000 = 41%. RPO: services share 85,993 / 150,238 = 57.2%; services RPO growth 85,993 / 75,976 - 1 = 13.2%; equipment RPO growth 64,245 / 43,047 - 1 = 49.2%; total RPO growth 150,238 / 119,023 - 1 = 26.2%; Power share of RPO at 30 June 2026 111,649 / 176,284 = 63.3%; Power equipment RPO 24,707 / 12,461 = 1.98 times; 39,261 / 24,707 - 1 = 59%. Electrification RPO 34,667 / 8,971 = 3.9 times (2022-2025); 34,667 / 9,642 = 3.6 years of 2025 segment revenue. Services RPO beyond 15 years 100% - 91% = 9%. Gas turbine backlog plus slot reservations at 30 June 2026 53 + 63 = 116 GW; 116 / 20 GW a year = 5.8 years of output. Gas turbine orders 173 / 112 - 1 = 54% (units), 29.8 / 20.2 - 1 = 48% (GW). Operating cash flow less the increase in contract liabilities 4,987 - 8,019 = -3,032 (2025). Net cash = cash less borrowings: 8,848 - 289 = 8,559 (31 Dec 2025); 13,120 - 2,849 = 10,271 (30 June 2026). Contract liabilities / equity attributable 39,944 / 11,957 = 3.3 times; contract liabilities less cash 39,944 - 13,120 = 26,824. Geography 2025: US 17,341 / 38,068 = 45.6%; US growth 17,341 / 12,467 - 1 = 39.1% (2023-2025); US share of pre-tax income 78 / 2,828 = 2.8%. Wind segment EBITDA 2021-2025 176 - 1,710 - 1,033 - 588 - 598 = -3,753; Offshore Wind contract losses 637 + 1,005 + 379 = 2,021 (2023-2025); Offshore Wind revenue 652 / 1,377 - 1 = -52.7%; Wind orders in units 854 / 2,290 - 1 = -62.7% (2023-2025); Wind revenue 9,110 / 9,701 - 1 = -6.1%; H1 2026 Wind EBITDA margin -657 / 3,459 = -19.0%. Power share of 2025 segment EBITDA 2,902 / (2,902 - 598 + 1,433) = 77.7%. Segment revenue growth 2025: Power 19,767 / 18,127 - 1 = 9.0%; Electrification 9,642 / 7,550 - 1 = 27.7%; revenue 38,068 / 34,935 - 1 = 9.0%. Growth 2021-2025 a year: Electrification (9,642 / 5,292)^(1/4) - 1 = 16.2%; Power (19,767 / 16,729)^(1/4) - 1 = 4.3%; Electrification 2023-2025 9,642 / 6,378 - 1 = 51.2%. Grid Solutions 6,620 / 3,226 - 1 = 105% (2021-2025); Nuclear Power 1,018 / 699 - 1 = 45.6% (2022-2025); Steam Power 1,937 / 3,270 - 1 = -40.8% (2021-2025). Electrification segment assets 21,000 / 9,017 = 2.3 times. Return on invested capital: invested capital = total assets less current liabilities less cash: 63,016 - 40,972 - 8,848 = 13,196 (2025); 51,485 - 31,685 - 8,205 = 11,595 (2024); average 12,395.5. NOPAT at an assumed 21% tax rate on operating income 1,388 x 0.79 = 1,096.5, ROIC 1,096.5 / 12,395.5 = 8.8% (2025); 2024 on year-end capital 471 x 0.79 / 11,595 = 3.2%. Adjusted basis: (adjusted EBITDA 3,196 - depreciation and amortization 847) x 0.79 = 1,855.7, / 12,395.5 = 15.0%. Capex / revenue 1,277 / 38,068 = 3.4%; capex growth 1,277 / 744 - 1 = 72% (2023-2025). 2025 capital returns 275 + 3,316 = 3,591. Average 2025 buyback price 3,316 / 8.2M shares = about $404. Shares outstanding 266,333,581 / 275,880,314 - 1 = -3.5% (Dec 2024 - June 2026). Dividends 2025 4 x $0.25 = $1.00. Valuation: P/E = market value / net income: 90.60 / 1.552 = 58.4 (2024); 177.33 / 4.884 = 36.3 (2025); trailing 255.05 / 9.529 = 26.8; 2025 excluding the $2.9bn tax benefit 4,884 - 2,900 = 1,984, 177.33 / 1.984 = 89. P/S 90.60 / 34.935 = 2.59; 177.33 / 38.068 = 4.66; 255.05 / 41.367 = 6.17. Trailing revenue 38,068 + 20,442 - 17,143 = 41,367; trailing net income 4,884 + 5,413 - 768 = 9,529; trailing net income less the Prolec gain 9,529 - 3,992 = 5,537. Forward EPS 957.63 / 45.68 = 20.96. Analyst target 1,237.34 / 957.63 - 1 = 29%. Price 957.63 / 1,195.94 - 1 = -20% from the 52-week high. 2026 guidance: revenue midpoint (45.5 + 46.5) / 2 = 46.0bn; adjusted EBITDA at 12%-14% of 46.0bn = 5.5-6.4bn; free cash flow midpoint 12.0bn; H1 revenue 20,442 / 46,000 = 44%; H1 free cash flow 9,897 / 12,000 = 82%. Wind 2026 EBITDA loss about 400 against 2025 598. Services RPO / 2025 services revenue 85,993 / 17,134 = 5.0 times; services RPO beyond five years 100% - 52% = 48%. Electrification orders / revenue 19.3 / 9.642 = 2.0 times; Electrification services / revenue 2,263 / 9,642 = 23.5%; Electrification 2026 EBITDA at 18% of 14.5bn = 2.61bn. Prolec gain / trailing net income 3,992 / 9,529 = 42%. 2025 tax benefit / net income 2,900 / 4,884 = 59%. Gas turbine market share 64.5 - 18.5 = 46.0 for the other four of the top five. Share price 957.63 / 327.79 = 2.9 times. Cumulative segment EBITDA 2021-2025: Power 1,407 + 1,655 + 1,722 + 2,268 + 2,902 = 9,954; Electrification -461 - 164 + 234 + 679 + 1,433 = 1,721. Adjusted EBITDA margin 807 / 33,239 = 2.4% (2023); 2,035 / 34,935 = 5.8% (2024). Power share of total revenue 19,767 / 38,068 = 51.9%; Gas Power share of Power 16,006 / 19,767 = 81%; Nuclear share of Power 1,018 / 19,767 = 5.2%; Grid Solutions share of Electrification 6,620 / 9,642 = 68.7%. Electrification revenue 9,642 / 5,076 - 1 = 90% (2022-2025). Wind revenue 9,110 / 11,539 - 1 = -21% (2021-2025); Wind share of revenue 9,110 / 38,068 = 23.9%. Segment EBITDA of the three segments 2,902 - 598 + 1,433 = 3,737. Q2 2026 orders / 2025 orders 24.2 / 59.3 = 41%. Electrification and other RPO at 30 June 2026 176,284 - 111,649 - 20,388 = 44,247. Power equipment RPO 39,261 / 12,461 = 3.2 times (Dec 2024 - June 2026). 2026 guidance midpoints: revenue 41.5 (Dec 2025), 44.5 (Jan 2026), 45.0 (Apr 2026), 46.0 (Jul 2026); free cash flow 4.75, 5.25, 7.0, 12.0. Market value 255.05 / 35.71 = 7.1 times the when-issued value. R&D / revenue 1,197 / 38,068 = 3.1%. Trailing revenue growth over 2024 41,367 / 34,935 - 1 = 18%. Power orders share 32.8 / 59.3 = 55%. Wind services / Power services 1,859 / 13,081 = 14%; onshore wind units / gas turbine units 59,000 / 7,000 = 8.4. Power services RPO / Power services revenue 69,841 / 13,081 = 5.3 years. Electrification H1 2026 EBITDA margin 1,200 / 6,597 = 18.2%; Power H1 2026 1,842 / 10,449 = 17.6%. Return on equity 2025 4,884 / ((11,178 + 9,546) / 2 = 10,362) = 47.1%; excluding the tax benefit (4,884 - 2,900) / 10,362 = 19.1%. Q2 2026 capex implied by operating cash flow less free cash flow 5,492 - 5,107 = 385. SG&A / revenue 5,360 / 29,654 = 18.1% (2022); 4,949 / 38,068 = 13.0% (2025). Cost of services growth 11,774 - 9,716 = 2,058; services revenue growth 17,134 - 14,981 = 2,153 (2023-2025). Electrification 2026 guide without Prolec (14.5 - 3.1) / 9.642 - 1 = 18%; (15.0 - 3.1) / 9.642 - 1 = 23%. HA installed base growth 51 / 126 = 40%. Contract liabilities / receivables at end-2025 25,774 / 9,803 = 2.6 times; receivables / revenue 9,803 / 38,068 = 26%. Backlog target progress (176.3 - 135) / (200 - 135) = 64%. Heavy-duty orders Q2 2026 / 2025 52 / 110 = 47%. Average capacity per gas turbine sold 15.3 / 81 = 0.19 GW (2025); 11.1 / 101 = 0.11 GW (2022). Equity / contract liabilities 11,957 / 39,944 = 30%. Cost of services growth 2,058 / 9,716 = 21%; services revenue growth 2,153 / 14,981 = 14% (2023-2025). Gas turbine orders / sales 29.8 / 15.3 = 1.9 (2025). Electrification share of guided 2026 revenue 14.75 / 46.0 = 32%; of 2025 revenue 9,642 / 38,068 = 25%. Electrification share of 2025 orders 19.3 / 59.3 = 33%. Aeroderivative orders 63 / 44 - 1 = 43% - gross margins, revenue mix and geography. — 2021-2026 · publ. September 2026 · source ↗
    Method: Arithmetic on figures reported in GE Vernova's Forms 10-K and 10-Q, the Form 10 information statement, results releases and market data; operands shown in the source line. The 21% tax rate used for NOPAT is the US federal statutory rate, an assumption, because the 2025 reported tax line is a benefit.
  3. ReportedOf that services backlog, 17% is expected within one year, 52% within five, 77% within ten and 91% within fifteen.
    GE Vernova Form 10-K for fiscal 2025 - remaining performance obligations note. — FY2025 · publ. 29 January 2026 · source ↗
  4. Moat Explorer calcAbout 9% runs beyond fifteen years.
    Moat Explorer calculation from GE Vernova's Forms 10-K and 10-Q, the Form 10 information statement, results releases and market data ($ millions unless stated). Equipment gross profit = sales of equipment less cost of equipment: 18,831 - 18,654 = 177 (2021, 0.9%); 15,819 - 16,972 = -1,153 (2022, -7.3%); 18,258 - 18,705 = -447 (2023, -2.4%); 18,952 - 17,989 = 963 (2024, 5.1%); 20,934 - 18,759 = 2,175 (2025, 10.4%). Services gross profit: 14,175 - 9,407 = 4,768 (2021, 33.6%); 13,835 - 9,224 = 4,611 (2022, 33.3%); 14,981 - 9,716 = 5,265 (2023, 35.1%); 15,983 - 10,861 = 5,122 (2024, 32.0%); 17,134 - 11,774 = 5,360 (2025, 31.3%). Services share of gross profit 5,360 / 7,535 = 71.1% (2025); 5,122 / 6,085 = 84.2% (2024); 5,265 / 4,818 = 109% (2023). Services share of revenue 17,134 / 38,068 = 45.0%. Power services share of Power revenue 13,081 / 19,767 = 66.2%. Gas Power share of revenue 16,006 / 38,068 = 42.0%. Gas turbines under long-term service agreements 1,800 / 7,000 = 26%; onshore wind turbines under service agreements 24,000 / 59,000 = 41%. RPO: services share 85,993 / 150,238 = 57.2%; services RPO growth 85,993 / 75,976 - 1 = 13.2%; equipment RPO growth 64,245 / 43,047 - 1 = 49.2%; total RPO growth 150,238 / 119,023 - 1 = 26.2%; Power share of RPO at 30 June 2026 111,649 / 176,284 = 63.3%; Power equipment RPO 24,707 / 12,461 = 1.98 times; 39,261 / 24,707 - 1 = 59%. Electrification RPO 34,667 / 8,971 = 3.9 times (2022-2025); 34,667 / 9,642 = 3.6 years of 2025 segment revenue. Services RPO beyond 15 years 100% - 91% = 9%. Gas turbine backlog plus slot reservations at 30 June 2026 53 + 63 = 116 GW; 116 / 20 GW a year = 5.8 years of output. Gas turbine orders 173 / 112 - 1 = 54% (units), 29.8 / 20.2 - 1 = 48% (GW). Operating cash flow less the increase in contract liabilities 4,987 - 8,019 = -3,032 (2025). Net cash = cash less borrowings: 8,848 - 289 = 8,559 (31 Dec 2025); 13,120 - 2,849 = 10,271 (30 June 2026). Contract liabilities / equity attributable 39,944 / 11,957 = 3.3 times; contract liabilities less cash 39,944 - 13,120 = 26,824. Geography 2025: US 17,341 / 38,068 = 45.6%; US growth 17,341 / 12,467 - 1 = 39.1% (2023-2025); US share of pre-tax income 78 / 2,828 = 2.8%. Wind segment EBITDA 2021-2025 176 - 1,710 - 1,033 - 588 - 598 = -3,753; Offshore Wind contract losses 637 + 1,005 + 379 = 2,021 (2023-2025); Offshore Wind revenue 652 / 1,377 - 1 = -52.7%; Wind orders in units 854 / 2,290 - 1 = -62.7% (2023-2025); Wind revenue 9,110 / 9,701 - 1 = -6.1%; H1 2026 Wind EBITDA margin -657 / 3,459 = -19.0%. Power share of 2025 segment EBITDA 2,902 / (2,902 - 598 + 1,433) = 77.7%. Segment revenue growth 2025: Power 19,767 / 18,127 - 1 = 9.0%; Electrification 9,642 / 7,550 - 1 = 27.7%; revenue 38,068 / 34,935 - 1 = 9.0%. Growth 2021-2025 a year: Electrification (9,642 / 5,292)^(1/4) - 1 = 16.2%; Power (19,767 / 16,729)^(1/4) - 1 = 4.3%; Electrification 2023-2025 9,642 / 6,378 - 1 = 51.2%. Grid Solutions 6,620 / 3,226 - 1 = 105% (2021-2025); Nuclear Power 1,018 / 699 - 1 = 45.6% (2022-2025); Steam Power 1,937 / 3,270 - 1 = -40.8% (2021-2025). Electrification segment assets 21,000 / 9,017 = 2.3 times. Return on invested capital: invested capital = total assets less current liabilities less cash: 63,016 - 40,972 - 8,848 = 13,196 (2025); 51,485 - 31,685 - 8,205 = 11,595 (2024); average 12,395.5. NOPAT at an assumed 21% tax rate on operating income 1,388 x 0.79 = 1,096.5, ROIC 1,096.5 / 12,395.5 = 8.8% (2025); 2024 on year-end capital 471 x 0.79 / 11,595 = 3.2%. Adjusted basis: (adjusted EBITDA 3,196 - depreciation and amortization 847) x 0.79 = 1,855.7, / 12,395.5 = 15.0%. Capex / revenue 1,277 / 38,068 = 3.4%; capex growth 1,277 / 744 - 1 = 72% (2023-2025). 2025 capital returns 275 + 3,316 = 3,591. Average 2025 buyback price 3,316 / 8.2M shares = about $404. Shares outstanding 266,333,581 / 275,880,314 - 1 = -3.5% (Dec 2024 - June 2026). Dividends 2025 4 x $0.25 = $1.00. Valuation: P/E = market value / net income: 90.60 / 1.552 = 58.4 (2024); 177.33 / 4.884 = 36.3 (2025); trailing 255.05 / 9.529 = 26.8; 2025 excluding the $2.9bn tax benefit 4,884 - 2,900 = 1,984, 177.33 / 1.984 = 89. P/S 90.60 / 34.935 = 2.59; 177.33 / 38.068 = 4.66; 255.05 / 41.367 = 6.17. Trailing revenue 38,068 + 20,442 - 17,143 = 41,367; trailing net income 4,884 + 5,413 - 768 = 9,529; trailing net income less the Prolec gain 9,529 - 3,992 = 5,537. Forward EPS 957.63 / 45.68 = 20.96. Analyst target 1,237.34 / 957.63 - 1 = 29%. Price 957.63 / 1,195.94 - 1 = -20% from the 52-week high. 2026 guidance: revenue midpoint (45.5 + 46.5) / 2 = 46.0bn; adjusted EBITDA at 12%-14% of 46.0bn = 5.5-6.4bn; free cash flow midpoint 12.0bn; H1 revenue 20,442 / 46,000 = 44%; H1 free cash flow 9,897 / 12,000 = 82%. Wind 2026 EBITDA loss about 400 against 2025 598. Services RPO / 2025 services revenue 85,993 / 17,134 = 5.0 times; services RPO beyond five years 100% - 52% = 48%. Electrification orders / revenue 19.3 / 9.642 = 2.0 times; Electrification services / revenue 2,263 / 9,642 = 23.5%; Electrification 2026 EBITDA at 18% of 14.5bn = 2.61bn. Prolec gain / trailing net income 3,992 / 9,529 = 42%. 2025 tax benefit / net income 2,900 / 4,884 = 59%. Gas turbine market share 64.5 - 18.5 = 46.0 for the other four of the top five. Share price 957.63 / 327.79 = 2.9 times. Cumulative segment EBITDA 2021-2025: Power 1,407 + 1,655 + 1,722 + 2,268 + 2,902 = 9,954; Electrification -461 - 164 + 234 + 679 + 1,433 = 1,721. Adjusted EBITDA margin 807 / 33,239 = 2.4% (2023); 2,035 / 34,935 = 5.8% (2024). Power share of total revenue 19,767 / 38,068 = 51.9%; Gas Power share of Power 16,006 / 19,767 = 81%; Nuclear share of Power 1,018 / 19,767 = 5.2%; Grid Solutions share of Electrification 6,620 / 9,642 = 68.7%. Electrification revenue 9,642 / 5,076 - 1 = 90% (2022-2025). Wind revenue 9,110 / 11,539 - 1 = -21% (2021-2025); Wind share of revenue 9,110 / 38,068 = 23.9%. Segment EBITDA of the three segments 2,902 - 598 + 1,433 = 3,737. Q2 2026 orders / 2025 orders 24.2 / 59.3 = 41%. Electrification and other RPO at 30 June 2026 176,284 - 111,649 - 20,388 = 44,247. Power equipment RPO 39,261 / 12,461 = 3.2 times (Dec 2024 - June 2026). 2026 guidance midpoints: revenue 41.5 (Dec 2025), 44.5 (Jan 2026), 45.0 (Apr 2026), 46.0 (Jul 2026); free cash flow 4.75, 5.25, 7.0, 12.0. Market value 255.05 / 35.71 = 7.1 times the when-issued value. R&D / revenue 1,197 / 38,068 = 3.1%. Trailing revenue growth over 2024 41,367 / 34,935 - 1 = 18%. Power orders share 32.8 / 59.3 = 55%. Wind services / Power services 1,859 / 13,081 = 14%; onshore wind units / gas turbine units 59,000 / 7,000 = 8.4. Power services RPO / Power services revenue 69,841 / 13,081 = 5.3 years. Electrification H1 2026 EBITDA margin 1,200 / 6,597 = 18.2%; Power H1 2026 1,842 / 10,449 = 17.6%. Return on equity 2025 4,884 / ((11,178 + 9,546) / 2 = 10,362) = 47.1%; excluding the tax benefit (4,884 - 2,900) / 10,362 = 19.1%. Q2 2026 capex implied by operating cash flow less free cash flow 5,492 - 5,107 = 385. SG&A / revenue 5,360 / 29,654 = 18.1% (2022); 4,949 / 38,068 = 13.0% (2025). Cost of services growth 11,774 - 9,716 = 2,058; services revenue growth 17,134 - 14,981 = 2,153 (2023-2025). Electrification 2026 guide without Prolec (14.5 - 3.1) / 9.642 - 1 = 18%; (15.0 - 3.1) / 9.642 - 1 = 23%. HA installed base growth 51 / 126 = 40%. Contract liabilities / receivables at end-2025 25,774 / 9,803 = 2.6 times; receivables / revenue 9,803 / 38,068 = 26%. Backlog target progress (176.3 - 135) / (200 - 135) = 64%. Heavy-duty orders Q2 2026 / 2025 52 / 110 = 47%. Average capacity per gas turbine sold 15.3 / 81 = 0.19 GW (2025); 11.1 / 101 = 0.11 GW (2022). Equity / contract liabilities 11,957 / 39,944 = 30%. Cost of services growth 2,058 / 9,716 = 21%; services revenue growth 2,153 / 14,981 = 14% (2023-2025). Gas turbine orders / sales 29.8 / 15.3 = 1.9 (2025). Electrification share of guided 2026 revenue 14.75 / 46.0 = 32%; of 2025 revenue 9,642 / 38,068 = 25%. Electrification share of 2025 orders 19.3 / 59.3 = 33%. Aeroderivative orders 63 / 44 - 1 = 43% - gross margins, revenue mix and geography. — 2021-2026 · publ. September 2026 · source ↗
    Method: Arithmetic on figures reported in GE Vernova's Forms 10-K and 10-Q, the Form 10 information statement, results releases and market data; operands shown in the source line. The 21% tax rate used for NOPAT is the US federal statutory rate, an assumption, because the 2025 reported tax line is a benefit.
  5. ReportedRPO is measured "excluding any purchase order that provides the customer with the ability to cancel or terminate without incurring a substantive penalty".
    GE Vernova Form 10-K for fiscal 2025 - remaining performance obligations note. — FY2025 · publ. 29 January 2026 · source ↗
  6. Moat Explorer calcServices backlog grew more slowly than equipment backlog in 2025: 13.2% against 49.2%.
    Moat Explorer calculation from GE Vernova's Forms 10-K and 10-Q, the Form 10 information statement, results releases and market data ($ millions unless stated). Equipment gross profit = sales of equipment less cost of equipment: 18,831 - 18,654 = 177 (2021, 0.9%); 15,819 - 16,972 = -1,153 (2022, -7.3%); 18,258 - 18,705 = -447 (2023, -2.4%); 18,952 - 17,989 = 963 (2024, 5.1%); 20,934 - 18,759 = 2,175 (2025, 10.4%). Services gross profit: 14,175 - 9,407 = 4,768 (2021, 33.6%); 13,835 - 9,224 = 4,611 (2022, 33.3%); 14,981 - 9,716 = 5,265 (2023, 35.1%); 15,983 - 10,861 = 5,122 (2024, 32.0%); 17,134 - 11,774 = 5,360 (2025, 31.3%). Services share of gross profit 5,360 / 7,535 = 71.1% (2025); 5,122 / 6,085 = 84.2% (2024); 5,265 / 4,818 = 109% (2023). Services share of revenue 17,134 / 38,068 = 45.0%. Power services share of Power revenue 13,081 / 19,767 = 66.2%. Gas Power share of revenue 16,006 / 38,068 = 42.0%. Gas turbines under long-term service agreements 1,800 / 7,000 = 26%; onshore wind turbines under service agreements 24,000 / 59,000 = 41%. RPO: services share 85,993 / 150,238 = 57.2%; services RPO growth 85,993 / 75,976 - 1 = 13.2%; equipment RPO growth 64,245 / 43,047 - 1 = 49.2%; total RPO growth 150,238 / 119,023 - 1 = 26.2%; Power share of RPO at 30 June 2026 111,649 / 176,284 = 63.3%; Power equipment RPO 24,707 / 12,461 = 1.98 times; 39,261 / 24,707 - 1 = 59%. Electrification RPO 34,667 / 8,971 = 3.9 times (2022-2025); 34,667 / 9,642 = 3.6 years of 2025 segment revenue. Services RPO beyond 15 years 100% - 91% = 9%. Gas turbine backlog plus slot reservations at 30 June 2026 53 + 63 = 116 GW; 116 / 20 GW a year = 5.8 years of output. Gas turbine orders 173 / 112 - 1 = 54% (units), 29.8 / 20.2 - 1 = 48% (GW). Operating cash flow less the increase in contract liabilities 4,987 - 8,019 = -3,032 (2025). Net cash = cash less borrowings: 8,848 - 289 = 8,559 (31 Dec 2025); 13,120 - 2,849 = 10,271 (30 June 2026). Contract liabilities / equity attributable 39,944 / 11,957 = 3.3 times; contract liabilities less cash 39,944 - 13,120 = 26,824. Geography 2025: US 17,341 / 38,068 = 45.6%; US growth 17,341 / 12,467 - 1 = 39.1% (2023-2025); US share of pre-tax income 78 / 2,828 = 2.8%. Wind segment EBITDA 2021-2025 176 - 1,710 - 1,033 - 588 - 598 = -3,753; Offshore Wind contract losses 637 + 1,005 + 379 = 2,021 (2023-2025); Offshore Wind revenue 652 / 1,377 - 1 = -52.7%; Wind orders in units 854 / 2,290 - 1 = -62.7% (2023-2025); Wind revenue 9,110 / 9,701 - 1 = -6.1%; H1 2026 Wind EBITDA margin -657 / 3,459 = -19.0%. Power share of 2025 segment EBITDA 2,902 / (2,902 - 598 + 1,433) = 77.7%. Segment revenue growth 2025: Power 19,767 / 18,127 - 1 = 9.0%; Electrification 9,642 / 7,550 - 1 = 27.7%; revenue 38,068 / 34,935 - 1 = 9.0%. Growth 2021-2025 a year: Electrification (9,642 / 5,292)^(1/4) - 1 = 16.2%; Power (19,767 / 16,729)^(1/4) - 1 = 4.3%; Electrification 2023-2025 9,642 / 6,378 - 1 = 51.2%. Grid Solutions 6,620 / 3,226 - 1 = 105% (2021-2025); Nuclear Power 1,018 / 699 - 1 = 45.6% (2022-2025); Steam Power 1,937 / 3,270 - 1 = -40.8% (2021-2025). Electrification segment assets 21,000 / 9,017 = 2.3 times. Return on invested capital: invested capital = total assets less current liabilities less cash: 63,016 - 40,972 - 8,848 = 13,196 (2025); 51,485 - 31,685 - 8,205 = 11,595 (2024); average 12,395.5. NOPAT at an assumed 21% tax rate on operating income 1,388 x 0.79 = 1,096.5, ROIC 1,096.5 / 12,395.5 = 8.8% (2025); 2024 on year-end capital 471 x 0.79 / 11,595 = 3.2%. Adjusted basis: (adjusted EBITDA 3,196 - depreciation and amortization 847) x 0.79 = 1,855.7, / 12,395.5 = 15.0%. Capex / revenue 1,277 / 38,068 = 3.4%; capex growth 1,277 / 744 - 1 = 72% (2023-2025). 2025 capital returns 275 + 3,316 = 3,591. Average 2025 buyback price 3,316 / 8.2M shares = about $404. Shares outstanding 266,333,581 / 275,880,314 - 1 = -3.5% (Dec 2024 - June 2026). Dividends 2025 4 x $0.25 = $1.00. Valuation: P/E = market value / net income: 90.60 / 1.552 = 58.4 (2024); 177.33 / 4.884 = 36.3 (2025); trailing 255.05 / 9.529 = 26.8; 2025 excluding the $2.9bn tax benefit 4,884 - 2,900 = 1,984, 177.33 / 1.984 = 89. P/S 90.60 / 34.935 = 2.59; 177.33 / 38.068 = 4.66; 255.05 / 41.367 = 6.17. Trailing revenue 38,068 + 20,442 - 17,143 = 41,367; trailing net income 4,884 + 5,413 - 768 = 9,529; trailing net income less the Prolec gain 9,529 - 3,992 = 5,537. Forward EPS 957.63 / 45.68 = 20.96. Analyst target 1,237.34 / 957.63 - 1 = 29%. Price 957.63 / 1,195.94 - 1 = -20% from the 52-week high. 2026 guidance: revenue midpoint (45.5 + 46.5) / 2 = 46.0bn; adjusted EBITDA at 12%-14% of 46.0bn = 5.5-6.4bn; free cash flow midpoint 12.0bn; H1 revenue 20,442 / 46,000 = 44%; H1 free cash flow 9,897 / 12,000 = 82%. Wind 2026 EBITDA loss about 400 against 2025 598. Services RPO / 2025 services revenue 85,993 / 17,134 = 5.0 times; services RPO beyond five years 100% - 52% = 48%. Electrification orders / revenue 19.3 / 9.642 = 2.0 times; Electrification services / revenue 2,263 / 9,642 = 23.5%; Electrification 2026 EBITDA at 18% of 14.5bn = 2.61bn. Prolec gain / trailing net income 3,992 / 9,529 = 42%. 2025 tax benefit / net income 2,900 / 4,884 = 59%. Gas turbine market share 64.5 - 18.5 = 46.0 for the other four of the top five. Share price 957.63 / 327.79 = 2.9 times. Cumulative segment EBITDA 2021-2025: Power 1,407 + 1,655 + 1,722 + 2,268 + 2,902 = 9,954; Electrification -461 - 164 + 234 + 679 + 1,433 = 1,721. Adjusted EBITDA margin 807 / 33,239 = 2.4% (2023); 2,035 / 34,935 = 5.8% (2024). Power share of total revenue 19,767 / 38,068 = 51.9%; Gas Power share of Power 16,006 / 19,767 = 81%; Nuclear share of Power 1,018 / 19,767 = 5.2%; Grid Solutions share of Electrification 6,620 / 9,642 = 68.7%. Electrification revenue 9,642 / 5,076 - 1 = 90% (2022-2025). Wind revenue 9,110 / 11,539 - 1 = -21% (2021-2025); Wind share of revenue 9,110 / 38,068 = 23.9%. Segment EBITDA of the three segments 2,902 - 598 + 1,433 = 3,737. Q2 2026 orders / 2025 orders 24.2 / 59.3 = 41%. Electrification and other RPO at 30 June 2026 176,284 - 111,649 - 20,388 = 44,247. Power equipment RPO 39,261 / 12,461 = 3.2 times (Dec 2024 - June 2026). 2026 guidance midpoints: revenue 41.5 (Dec 2025), 44.5 (Jan 2026), 45.0 (Apr 2026), 46.0 (Jul 2026); free cash flow 4.75, 5.25, 7.0, 12.0. Market value 255.05 / 35.71 = 7.1 times the when-issued value. R&D / revenue 1,197 / 38,068 = 3.1%. Trailing revenue growth over 2024 41,367 / 34,935 - 1 = 18%. Power orders share 32.8 / 59.3 = 55%. Wind services / Power services 1,859 / 13,081 = 14%; onshore wind units / gas turbine units 59,000 / 7,000 = 8.4. Power services RPO / Power services revenue 69,841 / 13,081 = 5.3 years. Electrification H1 2026 EBITDA margin 1,200 / 6,597 = 18.2%; Power H1 2026 1,842 / 10,449 = 17.6%. Return on equity 2025 4,884 / ((11,178 + 9,546) / 2 = 10,362) = 47.1%; excluding the tax benefit (4,884 - 2,900) / 10,362 = 19.1%. Q2 2026 capex implied by operating cash flow less free cash flow 5,492 - 5,107 = 385. SG&A / revenue 5,360 / 29,654 = 18.1% (2022); 4,949 / 38,068 = 13.0% (2025). Cost of services growth 11,774 - 9,716 = 2,058; services revenue growth 17,134 - 14,981 = 2,153 (2023-2025). Electrification 2026 guide without Prolec (14.5 - 3.1) / 9.642 - 1 = 18%; (15.0 - 3.1) / 9.642 - 1 = 23%. HA installed base growth 51 / 126 = 40%. Contract liabilities / receivables at end-2025 25,774 / 9,803 = 2.6 times; receivables / revenue 9,803 / 38,068 = 26%. Backlog target progress (176.3 - 135) / (200 - 135) = 64%. Heavy-duty orders Q2 2026 / 2025 52 / 110 = 47%. Average capacity per gas turbine sold 15.3 / 81 = 0.19 GW (2025); 11.1 / 101 = 0.11 GW (2022). Equity / contract liabilities 11,957 / 39,944 = 30%. Cost of services growth 2,058 / 9,716 = 21%; services revenue growth 2,153 / 14,981 = 14% (2023-2025). Gas turbine orders / sales 29.8 / 15.3 = 1.9 (2025). Electrification share of guided 2026 revenue 14.75 / 46.0 = 32%; of 2025 revenue 9,642 / 38,068 = 25%. Electrification share of 2025 orders 19.3 / 59.3 = 33%. Aeroderivative orders 63 / 44 - 1 = 43% - backlog, gas turbine slots, orders and customer deposits. — 2021-2026 · publ. September 2026 · source ↗
    Method: Arithmetic on figures reported in GE Vernova's Forms 10-K and 10-Q, the Form 10 information statement, results releases and market data; operands shown in the source line. The 21% tax rate used for NOPAT is the US federal statutory rate, an assumption, because the 2025 reported tax line is a benefit.
  7. ReportedBy June 2026 services RPO was $88,463 million.
    GE Vernova Form 10-Q for the quarter ended 30 June 2026 - the balance sheet, contract liabilities, borrowings, remaining performance obligations, orders and sales in units, business-unit revenue and the Prolec GE acquisition. — Q2 2026 · publ. 22 July 2026 · source ↗
  8. Moat Explorer calcThe services backlog is about five times the company's 2025 services revenue, which is a long runway for a business whose customers are utilities and grid operators.
    Moat Explorer calculation from GE Vernova's Forms 10-K and 10-Q, the Form 10 information statement, results releases and market data ($ millions unless stated). Equipment gross profit = sales of equipment less cost of equipment: 18,831 - 18,654 = 177 (2021, 0.9%); 15,819 - 16,972 = -1,153 (2022, -7.3%); 18,258 - 18,705 = -447 (2023, -2.4%); 18,952 - 17,989 = 963 (2024, 5.1%); 20,934 - 18,759 = 2,175 (2025, 10.4%). Services gross profit: 14,175 - 9,407 = 4,768 (2021, 33.6%); 13,835 - 9,224 = 4,611 (2022, 33.3%); 14,981 - 9,716 = 5,265 (2023, 35.1%); 15,983 - 10,861 = 5,122 (2024, 32.0%); 17,134 - 11,774 = 5,360 (2025, 31.3%). Services share of gross profit 5,360 / 7,535 = 71.1% (2025); 5,122 / 6,085 = 84.2% (2024); 5,265 / 4,818 = 109% (2023). Services share of revenue 17,134 / 38,068 = 45.0%. Power services share of Power revenue 13,081 / 19,767 = 66.2%. Gas Power share of revenue 16,006 / 38,068 = 42.0%. Gas turbines under long-term service agreements 1,800 / 7,000 = 26%; onshore wind turbines under service agreements 24,000 / 59,000 = 41%. RPO: services share 85,993 / 150,238 = 57.2%; services RPO growth 85,993 / 75,976 - 1 = 13.2%; equipment RPO growth 64,245 / 43,047 - 1 = 49.2%; total RPO growth 150,238 / 119,023 - 1 = 26.2%; Power share of RPO at 30 June 2026 111,649 / 176,284 = 63.3%; Power equipment RPO 24,707 / 12,461 = 1.98 times; 39,261 / 24,707 - 1 = 59%. Electrification RPO 34,667 / 8,971 = 3.9 times (2022-2025); 34,667 / 9,642 = 3.6 years of 2025 segment revenue. Services RPO beyond 15 years 100% - 91% = 9%. Gas turbine backlog plus slot reservations at 30 June 2026 53 + 63 = 116 GW; 116 / 20 GW a year = 5.8 years of output. Gas turbine orders 173 / 112 - 1 = 54% (units), 29.8 / 20.2 - 1 = 48% (GW). Operating cash flow less the increase in contract liabilities 4,987 - 8,019 = -3,032 (2025). Net cash = cash less borrowings: 8,848 - 289 = 8,559 (31 Dec 2025); 13,120 - 2,849 = 10,271 (30 June 2026). Contract liabilities / equity attributable 39,944 / 11,957 = 3.3 times; contract liabilities less cash 39,944 - 13,120 = 26,824. Geography 2025: US 17,341 / 38,068 = 45.6%; US growth 17,341 / 12,467 - 1 = 39.1% (2023-2025); US share of pre-tax income 78 / 2,828 = 2.8%. Wind segment EBITDA 2021-2025 176 - 1,710 - 1,033 - 588 - 598 = -3,753; Offshore Wind contract losses 637 + 1,005 + 379 = 2,021 (2023-2025); Offshore Wind revenue 652 / 1,377 - 1 = -52.7%; Wind orders in units 854 / 2,290 - 1 = -62.7% (2023-2025); Wind revenue 9,110 / 9,701 - 1 = -6.1%; H1 2026 Wind EBITDA margin -657 / 3,459 = -19.0%. Power share of 2025 segment EBITDA 2,902 / (2,902 - 598 + 1,433) = 77.7%. Segment revenue growth 2025: Power 19,767 / 18,127 - 1 = 9.0%; Electrification 9,642 / 7,550 - 1 = 27.7%; revenue 38,068 / 34,935 - 1 = 9.0%. Growth 2021-2025 a year: Electrification (9,642 / 5,292)^(1/4) - 1 = 16.2%; Power (19,767 / 16,729)^(1/4) - 1 = 4.3%; Electrification 2023-2025 9,642 / 6,378 - 1 = 51.2%. Grid Solutions 6,620 / 3,226 - 1 = 105% (2021-2025); Nuclear Power 1,018 / 699 - 1 = 45.6% (2022-2025); Steam Power 1,937 / 3,270 - 1 = -40.8% (2021-2025). Electrification segment assets 21,000 / 9,017 = 2.3 times. Return on invested capital: invested capital = total assets less current liabilities less cash: 63,016 - 40,972 - 8,848 = 13,196 (2025); 51,485 - 31,685 - 8,205 = 11,595 (2024); average 12,395.5. NOPAT at an assumed 21% tax rate on operating income 1,388 x 0.79 = 1,096.5, ROIC 1,096.5 / 12,395.5 = 8.8% (2025); 2024 on year-end capital 471 x 0.79 / 11,595 = 3.2%. Adjusted basis: (adjusted EBITDA 3,196 - depreciation and amortization 847) x 0.79 = 1,855.7, / 12,395.5 = 15.0%. Capex / revenue 1,277 / 38,068 = 3.4%; capex growth 1,277 / 744 - 1 = 72% (2023-2025). 2025 capital returns 275 + 3,316 = 3,591. Average 2025 buyback price 3,316 / 8.2M shares = about $404. Shares outstanding 266,333,581 / 275,880,314 - 1 = -3.5% (Dec 2024 - June 2026). Dividends 2025 4 x $0.25 = $1.00. Valuation: P/E = market value / net income: 90.60 / 1.552 = 58.4 (2024); 177.33 / 4.884 = 36.3 (2025); trailing 255.05 / 9.529 = 26.8; 2025 excluding the $2.9bn tax benefit 4,884 - 2,900 = 1,984, 177.33 / 1.984 = 89. P/S 90.60 / 34.935 = 2.59; 177.33 / 38.068 = 4.66; 255.05 / 41.367 = 6.17. Trailing revenue 38,068 + 20,442 - 17,143 = 41,367; trailing net income 4,884 + 5,413 - 768 = 9,529; trailing net income less the Prolec gain 9,529 - 3,992 = 5,537. Forward EPS 957.63 / 45.68 = 20.96. Analyst target 1,237.34 / 957.63 - 1 = 29%. Price 957.63 / 1,195.94 - 1 = -20% from the 52-week high. 2026 guidance: revenue midpoint (45.5 + 46.5) / 2 = 46.0bn; adjusted EBITDA at 12%-14% of 46.0bn = 5.5-6.4bn; free cash flow midpoint 12.0bn; H1 revenue 20,442 / 46,000 = 44%; H1 free cash flow 9,897 / 12,000 = 82%. Wind 2026 EBITDA loss about 400 against 2025 598. Services RPO / 2025 services revenue 85,993 / 17,134 = 5.0 times; services RPO beyond five years 100% - 52% = 48%. Electrification orders / revenue 19.3 / 9.642 = 2.0 times; Electrification services / revenue 2,263 / 9,642 = 23.5%; Electrification 2026 EBITDA at 18% of 14.5bn = 2.61bn. Prolec gain / trailing net income 3,992 / 9,529 = 42%. 2025 tax benefit / net income 2,900 / 4,884 = 59%. Gas turbine market share 64.5 - 18.5 = 46.0 for the other four of the top five. Share price 957.63 / 327.79 = 2.9 times. Cumulative segment EBITDA 2021-2025: Power 1,407 + 1,655 + 1,722 + 2,268 + 2,902 = 9,954; Electrification -461 - 164 + 234 + 679 + 1,433 = 1,721. Adjusted EBITDA margin 807 / 33,239 = 2.4% (2023); 2,035 / 34,935 = 5.8% (2024). Power share of total revenue 19,767 / 38,068 = 51.9%; Gas Power share of Power 16,006 / 19,767 = 81%; Nuclear share of Power 1,018 / 19,767 = 5.2%; Grid Solutions share of Electrification 6,620 / 9,642 = 68.7%. Electrification revenue 9,642 / 5,076 - 1 = 90% (2022-2025). Wind revenue 9,110 / 11,539 - 1 = -21% (2021-2025); Wind share of revenue 9,110 / 38,068 = 23.9%. Segment EBITDA of the three segments 2,902 - 598 + 1,433 = 3,737. Q2 2026 orders / 2025 orders 24.2 / 59.3 = 41%. Electrification and other RPO at 30 June 2026 176,284 - 111,649 - 20,388 = 44,247. Power equipment RPO 39,261 / 12,461 = 3.2 times (Dec 2024 - June 2026). 2026 guidance midpoints: revenue 41.5 (Dec 2025), 44.5 (Jan 2026), 45.0 (Apr 2026), 46.0 (Jul 2026); free cash flow 4.75, 5.25, 7.0, 12.0. Market value 255.05 / 35.71 = 7.1 times the when-issued value. R&D / revenue 1,197 / 38,068 = 3.1%. Trailing revenue growth over 2024 41,367 / 34,935 - 1 = 18%. Power orders share 32.8 / 59.3 = 55%. Wind services / Power services 1,859 / 13,081 = 14%; onshore wind units / gas turbine units 59,000 / 7,000 = 8.4. Power services RPO / Power services revenue 69,841 / 13,081 = 5.3 years. Electrification H1 2026 EBITDA margin 1,200 / 6,597 = 18.2%; Power H1 2026 1,842 / 10,449 = 17.6%. Return on equity 2025 4,884 / ((11,178 + 9,546) / 2 = 10,362) = 47.1%; excluding the tax benefit (4,884 - 2,900) / 10,362 = 19.1%. Q2 2026 capex implied by operating cash flow less free cash flow 5,492 - 5,107 = 385. SG&A / revenue 5,360 / 29,654 = 18.1% (2022); 4,949 / 38,068 = 13.0% (2025). Cost of services growth 11,774 - 9,716 = 2,058; services revenue growth 17,134 - 14,981 = 2,153 (2023-2025). Electrification 2026 guide without Prolec (14.5 - 3.1) / 9.642 - 1 = 18%; (15.0 - 3.1) / 9.642 - 1 = 23%. HA installed base growth 51 / 126 = 40%. Contract liabilities / receivables at end-2025 25,774 / 9,803 = 2.6 times; receivables / revenue 9,803 / 38,068 = 26%. Backlog target progress (176.3 - 135) / (200 - 135) = 64%. Heavy-duty orders Q2 2026 / 2025 52 / 110 = 47%. Average capacity per gas turbine sold 15.3 / 81 = 0.19 GW (2025); 11.1 / 101 = 0.11 GW (2022). Equity / contract liabilities 11,957 / 39,944 = 30%. Cost of services growth 2,058 / 9,716 = 21%; services revenue growth 2,153 / 14,981 = 14% (2023-2025). Gas turbine orders / sales 29.8 / 15.3 = 1.9 (2025). Electrification share of guided 2026 revenue 14.75 / 46.0 = 32%; of 2025 revenue 9,642 / 38,068 = 25%. Electrification share of 2025 orders 19.3 / 59.3 = 33%. Aeroderivative orders 63 / 44 - 1 = 43% - backlog, gas turbine slots, orders and customer deposits. — 2021-2026 · publ. September 2026 · source ↗
    Method: Arithmetic on figures reported in GE Vernova's Forms 10-K and 10-Q, the Form 10 information statement, results releases and market data; operands shown in the source line. The 21% tax rate used for NOPAT is the US federal statutory rate, an assumption, because the 2025 reported tax line is a benefit.
  9. ReportedOf services RPO then, 16% was expected within one year, 54% within five, 79% within ten and 92% within fifteen.
    GE Vernova Form 10-Q for the quarter ended 30 June 2026 - the balance sheet, contract liabilities, borrowings, remaining performance obligations, orders and sales in units, business-unit revenue and the Prolec GE acquisition. — Q2 2026 · publ. 22 July 2026 · source ↗